Engineering design resources
Organising planning, architectural, structural, MEP, energy, water, transport and industrial-design capabilities into reviewable briefs and deliverable schedules.
GROUND/FORWARD is a China-based civil recovery and reconstruction team. We connect engineering design, construction partners, equipment manufacturing and supply-chain resources in China for recovery projects in conflict-affected regions.
Delivery framework
Surveying, inspection and risk mapping
Water, power, heat and temporary space
Design, procurement and construction management
Spares, inspection and local training
About GROUND/FORWARD
GROUND/FORWARD was initiated by a team in China and focuses on civilian infrastructure recovery after war and conflict. Our role is not simply to export building materials. We organise design institutes, construction partners, equipment manufacturers, logistics resources and project-management capabilities into work packages that can be reviewed, procured and delivered.
China has resources across engineering design, equipment manufacturing, construction delivery and cross-border supply chains. GROUND/FORWARD starts with actual project conditions, screens resources against the stated need, and defines technical specifications, responsibilities, delivery evidence and local compliance requirements before deciding what can enter a project.
A resource network is not an unconditional commitment. Feasibility depends on civilian use, site safety, the project owner and funding, export controls, sanctions, transport conditions and local permits.
Organising planning, architectural, structural, MEP, energy, water, transport and industrial-design capabilities into reviewable briefs and deliverable schedules.
Connecting civil works, MEP installation, commissioning and project-management partners. Work requiring local licences is performed by appropriately qualified entities.
Screening suitable equipment and manufacturers for power, storage, water treatment, heating, modular buildings, construction machinery and industrial spares.
Bringing specifications, supplier verification, quality inspection, packing, transport, spares and delivery evidence into one traceable chain.
Turn fragmented recovery needs and engineering resources into clearly bounded project work packages
Connect need, design, manufacturing, local delivery and long-term operations without replacing statutory duty holders
Use specifications, milestones, inspections and handover records to support the recovery and maintenance of civilian services
Service framework
Services may be procured separately or combined into phased delivery packages for a city, community or facility. Each phase retains its inputs, decisions, verification evidence and open issues.
Turn site photos, surveys, structural inspections and equipment inventories into a project baseline for decision-making.
Restore essential public services with rapidly deployable water treatment, leak detection and wastewater units.
Develop phased recovery plans for hospitals, schools, communities and production facilities.
Deliver temporary or transitional public spaces that can open quickly and expand later.
Determine what can be repaired, replaced or retired before arranging spares, repairs and trial operation.
Create a traceable chain across schedule, cost, quality, evidence and ongoing maintenance.
Collaboration framework
GROUND/FORWARD sits between project needs and industrial resources: translating needs into briefs, organising resources into work packages, and mapping technical, procurement, licensing, construction and acceptance responsibilities item by item.
Define the facilities and users, ownership, site constraints, funding sources and procurement procedures, and participate in scope confirmation and acceptance.
Need, authority and acceptance
Perform locally licensed surveys, design certification, construction, supervision or statutory acceptance, and make professional judgments about site conditions.
Permits, site and statutory duties
Provide design collaboration, equipment solutions, manufacturing files, quality records, spare-parts plans and technical support against the project brief.
Engineering, manufacturing and supply
Define eligible use of funds, environmental and social requirements, audit rules, milestones and reporting so procurement and delivery remain traceable.
Funding, rules and oversight
Entry conditions
The decisive risks often sit outside construction itself: use, evidence, site access and the funding chain. If these conditions are not established, documents should be completed or commitments paused.
Identify end use, end users and beneficiaries. We do not take military projects or projects with opaque use.
Site location, extent of damage, ownership and existing information must be verifiable.
Site access, mine-action status and construction-safety conditions must be established before engineering commitments.
Funding source, procurement procedure, payment, insurance and currency risks must be written into the project boundaries.
Delivery method
Define the facility, users, damage scope, data basis and responsibilities.
Output: project problem statement
Verify documents and complete field investigation, risk registers and repair priorities.
Output: assessment and cost basis
Combine design, equipment, construction, logistics, acceptance and operating conditions.
Output: procurable work package
Complete commissioning, acceptance, training and follow-up inspection against agreed evidence.
Output: handover and O&M records
Scope & exclusions
This website presents a configurable service framework. It is not a quotation or a commitment on schedule, finance, permits or outcomes for any specific country, facility or site.
Public evidence
The following sources describe public recovery needs and funding frameworks. They do not constitute a project mandate, endorsement, investment advice or a feasibility conclusion for a specific project.
World Bank, Government of Ukraine, European Commission and United Nations
Used to understand public recovery needs across housing, transport, energy, commerce and industry, agriculture, and debris and mine-action work; the assessment covers conditions through 31 December 2025.
View original sourceEuropean Commission
Used to understand EU-supported recovery, reform, guarantee and investment frameworks. It does not indicate that any project has been awarded to this brand.
View original sourceUnited Nations Development Programme
Used to identify risks to electricity, water, communications, education, healthcare and local markets. This is an interim impact analysis.
View original sourceSources checked on 11 September 2026. Conflict conditions, damage, sanctions and funding arrangements may change; each project requires fresh verification.
CIVIFORWARD INSIGHTS
Working notes for project owners, local delivery partners, designers and manufacturers. The focus is requirements, procurement evidence, delivery control and project entry—not conflict commentary.
4 working notesProject preparation
A workable brief connects the asset, field evidence, end-use boundary, funding path and acceptance target.
Read the noteTechnical procurement
Freeze the use case and acceptance conditions before comparing models. Catalogue ratings are not site compatibility.
Read the noteSupply chain
Supplier count is not delivery capability. Requirements, versions, inspection, packing, transport and handover must remain connected.
Read the noteProject screening
This tool organises information locally in your browser and sends nothing to our server. Formal assessment still requires document checks, compliance review and confirmation of site conditions.
Screening output
Not every need should move directly into engineering.
After submission, a copyable project brief is generated on this device and is not sent to our server. It organises facts and open issues for an initial conversation; it is not an engineering quotation, compliance conclusion or delivery commitment.
Use and owner
Site and safety
Funding and procurement
Compliance and insurance
Contact
Use email to share project context and documents, or scan a QR code to begin a conversation on WhatsApp or WeChat.
Business emailxuzhiyang0928@gmail.com
Scan to contact us on WhatsApp.

Scan to add our WeChat contact.
Brand rationale
The Chinese name “向新重建” expresses the objective: not simply to reproduce pre-conflict conditions, but to use Chinese engineering and supply-chain resources to restore long-term capacity on the basis of facts, compliance and maintainability.