China-based civilian recovery team

Recovery startswith verifiable field evidence.

GROUND/FORWARD is a China-based civil recovery and reconstruction team. We connect engineering design, construction partners, equipment manufacturing and supply-chain resources in China for recovery projects in conflict-affected regions.

Civilian infrastructure firstEvidence-led decisionsCompliance before delivery

Delivery framework

From risk mapping to stable operation

4 stages
01

Field evidence

Surveying, inspection and risk mapping

02

Lifeline recovery

Water, power, heat and temporary space

03

Engineering delivery

Design, procurement and construction management

04

Sustained operations

Spares, inspection and local training

01project baseline
06service workstreams
Full cycleevidence trail

About GROUND/FORWARD

Based in China. Connecting design, construction and supply chains.

GROUND/FORWARD was initiated by a team in China and focuses on civilian infrastructure recovery after war and conflict. Our role is not simply to export building materials. We organise design institutes, construction partners, equipment manufacturers, logistics resources and project-management capabilities into work packages that can be reviewed, procured and delivered.

China has resources across engineering design, equipment manufacturing, construction delivery and cross-border supply chains. GROUND/FORWARD starts with actual project conditions, screens resources against the stated need, and defines technical specifications, responsibilities, delivery evidence and local compliance requirements before deciding what can enter a project.

A resource network is not an unconditional commitment. Feasibility depends on civilian use, site safety, the project owner and funding, export controls, sanctions, transport conditions and local permits.

01

Engineering design resources

Organising planning, architectural, structural, MEP, energy, water, transport and industrial-design capabilities into reviewable briefs and deliverable schedules.

02

Construction partners

Connecting civil works, MEP installation, commissioning and project-management partners. Work requiring local licences is performed by appropriately qualified entities.

03

Equipment manufacturing

Screening suitable equipment and manufacturers for power, storage, water treatment, heating, modular buildings, construction machinery and industrial spares.

04

Supply-chain coordination

Bringing specifications, supplier verification, quality inspection, packing, transport, spares and delivery evidence into one traceable chain.

Mission

Turn fragmented recovery needs and engineering resources into clearly bounded project work packages

Our role

Connect need, design, manufacturing, local delivery and long-term operations without replacing statutory duty holders

Delivery objective

Use specifications, milestones, inspections and handover records to support the recovery and maintenance of civilian services

Service framework

Restore basic operations first. Build long-term capacity next.

Services may be procured separately or combined into phased delivery packages for a city, community or facility. Each phase retains its inputs, decisions, verification evidence and open issues.

01

Damage assessment and risk mapping

Turn site photos, surveys, structural inspections and equipment inventories into a project baseline for decision-making.

  • Drone and ground surveys
  • Initial structural and MEP inspection
  • Quantities and repair priorities
02

Water and environmental recovery

Restore essential public services with rapidly deployable water treatment, leak detection and wastewater units.

  • Mobile and modular water treatment
  • Water-network investigation
  • Debris and contaminant classification
03

Power, heat and microgrids

Develop phased recovery plans for hospitals, schools, communities and production facilities.

  • Backup power and energy storage
  • Distribution-system recovery
  • Heating and efficiency upgrades
04

Modular public facilities

Deliver temporary or transitional public spaces that can open quickly and expand later.

  • Modular schools and clinics
  • Temporary housing and sanitation units
  • Site installation and acceptance
05

Industrial and agricultural restart

Determine what can be repaired, replaced or retired before arranging spares, repairs and trial operation.

  • Production-equipment damage diagnosis
  • Spare substitution and repair
  • Agricultural storage and cold-chain recovery
06

Project controls and operations

Create a traceable chain across schedule, cost, quality, evidence and ongoing maintenance.

  • Feasibility and procurement documents
  • Schedule, cost and quality controls
  • Spares, inspection and local training

Collaboration framework

Connecting four partner groups without replacing their responsibilities.

GROUND/FORWARD sits between project needs and industrial resources: translating needs into briefs, organising resources into work packages, and mapping technical, procurement, licensing, construction and acceptance responsibilities item by item.

01

Project owners and clients

Define the facilities and users, ownership, site constraints, funding sources and procurement procedures, and participate in scope confirmation and acceptance.

Need, authority and acceptance

02

Local professional and delivery partners

Perform locally licensed surveys, design certification, construction, supervision or statutory acceptance, and make professional judgments about site conditions.

Permits, site and statutory duties

03

Chinese design and manufacturing resources

Provide design collaboration, equipment solutions, manufacturing files, quality records, spare-parts plans and technical support against the project brief.

Engineering, manufacturing and supply

04

Funders and programme managers

Define eligible use of funds, environmental and social requirements, audit rules, milestones and reporting so procurement and delivery remain traceable.

Funding, rules and oversight

01Define the need
02Match resources
03Deliver locally
04Accept and operate

Entry conditions

Every project must pass four gates.

The decisive risks often sit outside construction itself: use, evidence, site access and the funding chain. If these conditions are not established, documents should be completed or commitments paused.

01

Civilian purpose

Identify end use, end users and beneficiaries. We do not take military projects or projects with opaque use.

02

Evidence baseline

Site location, extent of damage, ownership and existing information must be verifiable.

03

Safe access

Site access, mine-action status and construction-safety conditions must be established before engineering commitments.

04

Funding path

Funding source, procurement procedure, payment, insurance and currency risks must be written into the project boundaries.

Delivery method

Every step has an output and a stop condition.

A

Define the problem

Define the facility, users, damage scope, data basis and responsibilities.

Output: project problem statement

B

Build the baseline

Verify documents and complete field investigation, risk registers and repair priorities.

Output: assessment and cost basis

C

Form the delivery package

Combine design, equipment, construction, logistics, acceptance and operating conditions.

Output: procurable work package

D

Verify and hand over

Complete commissioning, acceptance, training and follow-up inspection against agreed evidence.

Output: handover and O&M records

Scope & exclusions

A project can start only when its service boundaries are clear.

This website presents a configurable service framework. It is not a quotation or a commitment on schedule, finance, permits or outcomes for any specific country, facility or site.

Included

May enter a project work package

  • Needs clarification, document checks and a field-investigation plan
  • Repair priorities, cost-planning basis and procurement work packages
  • Equipment supply, construction planning and third-party coordination
  • Commissioning, acceptance, handover records, spares and an operating plan
Excluded

Not promised at website level

  • Military, weapons-related or opaque-use projects
  • Sanctions or export-control evasion, or opaque payment arrangements
  • Unlicensed mine action, structural certification or local professional practice
  • Guarantees on finance, outcomes, schedule or cost before due diligence

Public evidence

Public sources frame the need. Field evidence determines the project.

The following sources describe public recovery needs and funding frameworks. They do not constitute a project mandate, endorsement, investment advice or a feasibility conclusion for a specific project.

0123 Feb 2026

World Bank, Government of Ukraine, European Commission and United Nations

Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5)

Used to understand public recovery needs across housing, transport, energy, commerce and industry, agriculture, and debris and mine-action work; the assessment covers conditions through 31 December 2025.

View original source
02Updated Jun 2026

European Commission

Ukraine Facility and Ukraine Investment Framework

Used to understand EU-supported recovery, reform, guarantee and investment frameworks. It does not indicate that any project has been awarded to this brand.

View original source
0331 Mar 2026

United Nations Development Programme

Economic and human-development impacts of military escalation across Iran

Used to identify risks to electricity, water, communications, education, healthcare and local markets. This is an interim impact analysis.

View original source

Sources checked on 11 September 2026. Conflict conditions, damage, sanctions and funding arrangements may change; each project requires fresh verification.

Project screening

Create a project baseline for the next conversation.

This tool organises information locally in your browser and sends nothing to our server. Formal assessment still requires document checks, compliance review and confirmation of site conditions.

Screening output

Project entry conditions

LOCAL ONLY

Not every need should move directly into engineering.

After submission, a copyable project brief is generated on this device and is not sent to our server. It organises facts and open issues for an initial conversation; it is not an engineering quotation, compliance conclusion or delivery commitment.

01

Use and owner

02

Site and safety

03

Funding and procurement

04

Compliance and insurance

Contact

Start with verifiable project requirements.

Use email to share project context and documents, or scan a QR code to begin a conversation on WhatsApp or WeChat.

Business emailxuzhiyang0928@gmail.com

WhatsApp

01
GROUND/FORWARD WhatsApp contact QR code

Scan to contact us on WhatsApp.

WeChat

02
GROUND/FORWARD WeChat contact QR code

Scan to add our WeChat contact.

Brand rationale

GROUND is the field. FORWARD is recovery in motion.

The Chinese name “向新重建” expresses the objective: not simply to reproduce pre-conflict conditions, but to use Chinese engineering and supply-chain resources to restore long-term capacity on the basis of facts, compliance and maintainability.